After June 30, 2026: What Still Exists for New Chargers — State and Utility Rebates Only
The federal 30C credit ended for new placements on June 30, 2026. What remains, checked November 1, 2026, is state and utility support only — and it varies by territory, with different timing rules.
The Short Answer
The federal Section 30C credit ended for property placed in service after June 30, 2026. That is the starting point for any new charger installation now, and it does not change because a state or utility program exists.
What still exists for a new installation is different in kind: state and utility rebates, bill credits, and subscription programs, each run by its own administrator, with its own territory, funding, deadline, and timing rule. This post is a dated update, not a directory. It lists only programs verified from primary sources on November 1, 2026, in five states. A program not listed here was not checked, not proved absent — and a program listed here can change without notice, so confirm it with the administrator before you buy or install.
Educational information only. This post explains programs in plain language. It is not tax, legal, or financial advice, and it does not determine whether any particular person or property qualifies for any program.
What ended, and what did not
- Ended for new placements: the federal 30C credit, under IRS Instructions for Form 8911 (Rev. December 2025). Property placed in service after June 30, 2026, does not qualify, however eligible the census tract looks.
- Did not end: state and utility programs. They are separate from 30C, they do not require a 30C-eligible census tract, and the end of 30C does not end them — just as their existence does not revive 30C.
- Stacking, correctly scoped: combining a utility rebate with a federal 30C credit only applies to equipment placed in service on or before June 30, 2026, in an eligible census tract, and whether a rebate affects the federal cost basis is a question to check for the placed-in-service year, not a settled rule stated in the Form 8911 instructions. For a new installation, there is no federal credit to stack with.
California — verified November 1, 2026
- PG&E Residential EV Charging Rebate: Standard track up to 50% of the eligible equipment purchase price, apply within 180 days of purchase. Rebate Plus, income-qualified, up to $2,000 for installation and up to $5,000 for panel upgrade plus installation — but Rebate Plus requires application before a contractor purchases or installs equipment; already-purchased equipment is ineligible for that track.
- LADWP Residential EV Charger Rebate: up to $1,000, up to $1,500 for income-qualified Lifeline/EZ-SAVE customers, plus $250 for a dedicated EV meter. LADWP advises booking a service assessment before installing.
- SCE Charge Ready Home: restricted, not a general SCE rebate — income-based, public-assistance-based, or Disadvantaged Community eligibility only, with prequalification before the contractor is paid. No dollar amount was stated on the eligibility page reviewed, so none is quoted here.
- SMUD Charge@Home: up to $850 toward equipment and installation.
- Not verified: no SDG&E home-charger purchase rebate and no California statewide home-charger tax credit were verified in this check. Do not assume either exists from a provider list alone.
New York — read this one carefully
New York is the state where a general “state and utility rebates exist” summary misleads most.
- NYSERDA Charge Ready NY 2.0: $3,000 per Level 2 port, plus $1,000 per port in a Disadvantaged Community, with a $28 million budget after a February 2026 top-up. It covers workplaces, multifamily properties, and hotels/motels — not a single-family homeowner’s own home charger. It is a rebate, not a state tax credit.
- Con Edison PowerReady: closed to new Level 2 applications as of April 22, 2026.
- Con Edison SmartCharge NY: an off-peak charging behaviour credit, not a charger purchase rebate.
- Not verified: no residential purchase rebate for National Grid, NYSEG, RG&E, Central Hudson, or LIPA was verified in this check, and no New York statewide home-charger tax credit was verified.
If you are a New York homeowner looking for help buying your own home charger, this check found no verified program for that case. Check the administrator pages directly before assuming otherwise.
Michigan — verified November 1, 2026
- Consumers Energy PowerMIDrive: $500, up to $1,000 income-qualified, for a qualified Level 2 charger at a primary residence, capped at 9.6 kW, with enrollment in the Nighttime Savers Rate (overnight charging) required.
- DTE Energy Home EV Charger Rebate: income-gated, for current DTE residential customers in good standing, apply within 6 months of installing the charger. No dollar amount was stated on the primary page text reviewed, so none is quoted here.
- Not verified: no Michigan statewide home-charger tax credit and no Lansing Board of Water & Light purchase rebate were verified in this check.
Texas — one verified program, not statewide
- Austin Energy Home EV Charger Rebate: up to $500 or 50% of the purchase price, for a Power Partner EV-compatible Level 2 station, in Austin Energy territory only — not statewide. Enrollment in Power Partner EV is a prerequisite, funding is first-come, first-served, and the rebate is not guaranteed until after Austin Energy’s review.
- Not verified: no home-charger purchase rebate for CPS Energy, Oncor, CenterPoint, AEP Texas, or Pedernales was verified in this check, and no Texas statewide rebate or tax credit was verified.
Florida — rebates are not the whole story here
- FPL EVolution Home: a subscription, not a purchase rebate. FPL supplies, installs, and maintains a Level 2 charger for a monthly charge over a 10-year term. Charges vary by offer, so check the live FPL page rather than relying on a single figure. You cannot use your own existing charger under this program.
- Duke Energy Florida Off-Peak Charging Credit: $7.50 per month for Level 2 charging during off-peak hours, up to 2 EVs per account. This is a bill credit for charging behaviour, not a rebate for buying a charger.
- Not verified: no residential purchase rebate for Duke Energy Florida, TECO, JEA, OUC, or Florida City Gas was verified in this check.
Timing rules differ — do not assume “apply before you install”
A blanket “always apply before installation” rule is false. PG&E Standard allows application within 180 days after purchase, Austin Energy reviews after application, Consumers and DTE accept applications after installation (DTE within 6 months). Other tracks are the opposite: PG&E Rebate Plus requires application before purchase/installation, and SCE Charge Ready Home requires prequalification before the contractor is paid. The rule is per program, and getting it wrong can disqualify a track — check the program page first, for that program.
How to check your own utility
If your state or utility is not listed above, it was not checked in this update. Do this, in order:
- Find your utility’s own EV program page — not a third-party summary.
- Check the DOE Alternative Fuels Data Center Laws and Incentives database and DSIRE for your state, then confirm any amount, deadline, and preapproval rule with the administrator.
- Note the territory (many programs cover one utility area, not a whole state), whether the offer is a purchase rebate, a bill credit, or a subscription, and whether funding is first-come, first-served.
Programs change, funding can be depleted, and terms can change without notice. A November 1, 2026, verification is a starting point, not a guarantee.
Sources
- IRS, Instructions for Form 8911 (Rev. December 2025) — 30C termination June 30, 2026. https://www.irs.gov/instructions/i8911
- State and utility program pages checked November 1, 2026, as recorded in this site’s state/utility verification for California, New York, Michigan, Texas, and Florida — PG&E, LADWP, SCE, SMUD, NYSERDA Charge Ready NY 2.0, Con Edison PowerReady and SmartCharge NY, Consumers Energy PowerMIDrive, DTE Energy Home EV Charger Rebate, Austin Energy, FPL EVolution Home, and Duke Energy Florida Off-Peak Charging Credit. Programs and amounts not listed as verified above were not verified in that check and are not claimed here.
Quick Verification Checklist
- Verify Location Eligibility Use the DOE mapping tool to confirm your census tract.
- Keep Hardware Receipts Maintain proof of purchase for your EV charger.
- Keep Itemized Invoices Ensure your electrician provides a detailed labor and permit invoice.
- Placed in service on or before June 30, 2026? Only equipment placed in service on or before June 30, 2026 can qualify; new installations after that date do not.